Published on May 21st, 2014

San Diego Auto Dealer Remodeling Project

Background

The Auto Dealer has a wide selection of new and used cars. It also has a separate lot for trucks.

The Challenge

The challenge was to expand their service center to include alignment capabilities for larger vehicles.

Our Solution

We demolished existing concrete and installed Pits for Hunter alignment systems to accommodate new requirements.

Project Details

Saw, cut and demoed existing concrete slab and excavated to a depth of 24” inches. Fabricated steel frame formed and poured concrete pits to accommodate Hunter alignment racks. Installed conduit run for hydraulic and electronics to operate the system.

Project needed to be completed in 1 week so they could get up and running with minimum downtime to their service center. The job was accomplished on time and on-budget. Bob baker was referred to us by Hunter engineering, we are their preferred vendor for pits installation.