La Jolla Surf Shop Storefront Restoration
Background
Old store needed a facelift.
The Challenge
Rebuilding while businesses were still in operation and a tight 90 day window of completion before spring break.
Our Solution
Stripped everything down to the studs, installed new windows, new lath plaster and restucco exterior walls. Removed planter and installed new drain for down spouts, repainted building and installed new awnings. Completed on time and under budget.
Other Projects
Waterproof Retention Wall
A client’s property has a hill on one of its sides which was pouring soil into the neighbors backyards and causing damage to their properties.
Water Intrusion in Rancho San Diego, CA
The Problem A condo in Rancho San Diego was having water intrusion throughout the unit exterior wall, 65 lineal feet. The association asked McKowski’s to investigate and provide a proposal to repair. It was discovered the sprinklers were too close to the building and soaked the stucco every time they came on. The constant waterContinue reading "Water Intrusion in Rancho San Diego, CA"
Water Intrusion in Mira Mesa, CA
The Problem A property in Mira Mesa reported they had water intrusion from the exterior front door upper landing into the garage below. The lower staircase had dry rot in the ledger boards that supported the concrete steps and they were becoming unsafe. The Solution The HOA called McKowski’s and a bid to repair wasContinue reading "Water Intrusion in Mira Mesa, CA"