Published on June 10th, 2017
Outdoor BBQ Renovation
Background
Old bbq was too large and was not user friendly causing problems to the association members.
The Challenge
Install functional bbq that could be more user friendly while improving the aesthetic of the patio area.
Our Solution
Removed existing pit bbq and installed new gas and electrical lines, refaced pit, poured new concrete top and installed new ceramic tile, installed flagstaff stack bricks on face front of barbecue structure.
Other Projects
Pool Coping Renovation in Mission Valley
The Problem Pool Coping getting old and dried up? This slideshow requires JavaScript. The Solution This Mission Valley property called McKowski's for help. McKowski's will remove your old pool coping, clean out the concrete channel, install backer rod, apply coping and then apply Silika sand to the coping surface to give it a nice texturedContinue reading "Pool Coping Renovation in Mission Valley"
Perimeter Wall Rebuild for HOA in Del Sur California
The Problem At a busy intersection in Del Sur California, a car hit the corner perimeter wall and damaged it beyond repair. This slideshow requires JavaScript. The Solution The HOA Master Association called McKowski's to see if we could rebuild the wall. The chocolate brown decorative blocks and brown mortar were specially ordered and deliveredContinue reading "Perimeter Wall Rebuild for HOA in Del Sur California"
Water Intrusion Repair For HOA in Mission Valley
The Problem An HOA built in the 80s in Mission Valley has water intrusion into their basements. Over the years the water barrier on the block wall has deteriorated. The concrete patios have lifted, and the soil level has raised so they are flushed with the basement vents. During heavy rains, the water flows directlyContinue reading "Water Intrusion Repair For HOA in Mission Valley"