Published on June 10th, 2017
Outdoor BBQ Renovation
Background
Old bbq was too large and was not user friendly causing problems to the association members.
The Challenge
Install functional bbq that could be more user friendly while improving the aesthetic of the patio area.
Our Solution
Removed existing pit bbq and installed new gas and electrical lines, refaced pit, poured new concrete top and installed new ceramic tile, installed flagstaff stack bricks on face front of barbecue structure.
Other Projects
Termite Damage Repair in North Park
The Problem An association in North Park had termite damage to their stair stringer, and the concrete landing was cracking. This slideshow requires JavaScript. The Solution We have done work for this association in the past so they asked if we could help. McKowski's expert team was able to remove and replace both of theContinue reading "Termite Damage Repair in North Park"
Paver Work for Homeowner in Del Sur
The Problem A homeowner in Del Sur had some paver work done by another vendor, and it was not done correctly. There was a large 1" gap between the garage floor and the last row of pavers. They filled it with Grey Polymeric sand but the gap was to wide so the sand broke downContinue reading "Paver Work for Homeowner in Del Sur"
Water Intrusion Repair in Rancho Bernardo
The Problem A unit had water intrusion from the front and side wall of the bedroom. The water ruined the drywall and flooring. McKowski's was asked to identify the source of the water and provide a proposal to repair it. The drywall was removed, and the source of the water intrusion was clear. On theContinue reading "Water Intrusion Repair in Rancho Bernardo"