fbpx
published on Jul 23, 2014

Residential Bath Remodeling

Background

Bathroom remodeling for residential client.

The Challenge

To create a new more open look by removing the door between the vanity and shower area, removing the dated wallpaper and tight white 4×4 tile on the counter top and tub area. Also because of age there was a significant amount of mold which had accumulated around the tub and fixtures, upon further exploration there was no active mold or spores behind wall board.

Our Solution

Remove all wallpaper, tile, countertop, floor tile and fixtures and replace them.

Project Details

We removed all wallpaper, tile, countertop, floor tile and fixtures and replaced them with a new shower mixer 1 foot x 2 foot porcelain tile in shower area, 1 foot x 1 foot non-glazed porcelain tile on floor , counter, with accent brick band, texture walls to match existing, replace all F stops and fixtures, including tub and tub enclosure, and replace with new, paint all surfaces with Simi-gloss enamel, install new base boards and trim. Turnaround time was three weeks start to finish. Another completely satisfied McKowski’s customer.

Other Projects

Landscape Remodeling Project in San Diego

This project required the removal of 976 linear feet of  California round panels. That is approximately 122 panels.

Landscape Install in San Diego

Customer came to us to Landscape area required by Home owners Association to be completed by a certain time or penalties would be imposed.

Residential Bathroom Remodel

Customer wanted to convert their old bathroom with tub and toilet behind a partition wall with door to an open concept bathroom with a large walk in shower.